HALL SYSTEM
więcej
We specialise in the design and construction of modern
warehouse, production and logistics halls. Our priority is to understand the
actual needs of the users, which allows us to shape customised solutions. We
develop industrial construction in line with the latest trends in environmental
protection and energy use. The quality of our products and services is based on
solid foundations.
DESIGN IT YOURSELF BUILD WITH US
Use
our configurator to customise the dimensions and options to suit your
individual needs. Receive a quick project quotation and build a hall to suit
your needs!
Safety is a
priority in any construction project, which is why our prefabricated hall
system, based on reinforced concrete structures, guarantees not only robustness
but also unparalleled safety.
Durability at a high level
Prefabrication
allows the design to be adapted to specific loads and conditions, significantly
increasing the safety and efficiency of the structure. Our prefabricated halls
are carefully designed, eliminating the risk of overloading and ensuring
optimal working conditions. The use of concrete as the main construction
material ensures extraordinary resistance to dynamic loads and those from
weather conditions, such as heavy rain. Reinforced concrete structures can cope
with heavy loads, which contributes to the stability and safety of the entire
structure.
Fire safety
Reinforced concrete structures have a high
resistance to heat and fire in the event of a fire, far superior to other
construction materials such as steel. Precast reinforced concrete elements
maintain their load-bearing capacity for a longer period of time than
traditional steel, allowing more time for evacuation and rescue efforts. As a
non-combustible material, concrete is effective in reducing the risk of fire
spreading in a production hall. This property is crucial in the event of a
fire, ensuring the protection of workers.
We offer a
green investment for your business, combining modern technology with care for
the environment. By investing in our green solutions, you are not only
investing in a solid structure, but also in the future of the planet.
With ecology in mind.
In
designing the prefabricated halls, we have focused on minimising the use of
cement, resulting in a significant reduction in CO2 emissions to the
environment. Our solutions emphasise sustainable practices, helping your
business to reduce its carbon footprint.
Eco-Prefabrication
Our
prefabricated components are manufactured in a controlled factory environment
by trained staff. Input materials undergo rigorous quality control to use
resources efficiently and meet environmental standards.
Eco-Energy
We
recommend the use of photovoltaic systems, mounted on the roof of a
prefabricated hall, to supply your business with green energy. In this way, you
not only reduce your energy costs, but also participate in developing the
ecological side of your business.
Eco-Concrete
The precast concrete used in our halls requires
significantly less cement compared to traditional concrete, which translates
into reduced CO2 emissions.
Prefabricated
elements, used in the construction of halls, reduce assembly time, increase
safety on site, reduce the number of workers needed for construction and the
impact of weather conditions on the progress of the work. Why is p.Hale the
best choice?
Construction
By
prestressing the reinforced concrete structures, our system allows us to
increase the usable space by reducing the dimensions of the roof elements. This
allows maximum use of the available space.
Space
p.Hale
solutions make it possible to reduce the volume of the entire building, while
maintaining the required height inside the hall. This enables you to manage
space effectively and use the building optimally.
Installations
The girders
and pillars of prefabricated halls have specially prepared openings to allow
the distribution of gas, water, vacuum drainage or compressed air installations. This is an efficient solution,
eliminating the need for subsequent modifications.
Precision vs. Time
Thanks to our modular design and precision
fabrication of components, we reduce construction time, which is crucial for
clients who value on-time delivery of projects.
Innovation
is in the details, and our patents exceed customer expectations in terms of
optimal strength, durability and diversity of solutions.
Versatility
The
standard elements of our Hall System are flexible, allowing for customisation.
In our approach, each project is not just a structure, but a unique creation
that creates value for the buyer.
Complexity
Our complex
construction solutions are not limited to the construction of logistics and
warehouse facilities. We can meet the challenges of building complex industrial
plants such as coffee roasters, mints or bakeries. We take care of the
diversity of projects and comprehensive customer service at every stage. We
strive to ensure that each prefabricated hall is not only functional, but also
meets the aesthetics and individual preferences of the client.
Knowledge
The
components of our prefabricated hall system have a number of patented design
solutions. In addition, we invest in research and innovation, striving for
climate neutrality in all products and production processes. Thanks to our
modular design and the precise manufacture of the components, we reduce
construction times, which is crucial for customers who value punctuality and
the highest quality.
(+48) 887 183 055
sprzedaz@phale.pl
Szarych Szeregów 27
60-462 Poznań
woj. wielkopolskie
Monday Friday
08:30 - 17:30
Pekabex BET S.A.
NIP: 7812026252
REGON: 520143286
Contact form
* As part
of our cooperation, we offer comprehensive advice both before purchasing a plot
of land and during the entire process associated with building a house. Our
architects will help you make the best use of the land, obtain the necessary
certificates and advise you on the right solution for your needs. Feel free to
contact us to find out more.
The
information contained on the website does not constitute an offer within the
meaning of the Civil Code, but only an invitation to conclude a contract. Once you
have selected the type of design and options for personalisation, please
contact us to discuss the conditions of establishing cooperation.
PEKABEX BET
S.A. with registered office in Poznań, ul. Szarych Szeregów 27, 60-462 Poznań,
entered into the register of entrepreneurs kept by the District Court Poznań -
Nowe Miasto and Wilda in Poznań, 8th Economic Division of the National Court
Register under KRS no. 0000343297, NIP: 7811846303, REGON 301314381, with a share
capital of PLN 3,000,000.00, paid in full, BDO no.: 000016759.